Details for NOTICE OF LOCATION AND DESIGN APPROVAL

NOTICE OF LOCATION AND DESIGN APPROVAL P. I. 0013925 MCDUFFIE COUNTY Notice is hereby given in compliance with Georgia Code 22-2-109 and 32-3-5 that the Georgia Department of Transportation has approved the Location and Design of this project. The date of location and design approval is: __January 28, 2020____ Project 0013925 is located approximately 3.6 miles South-East of Thomson, Georgia in McDuffie County and will replace the bridge located at SR 10/US 278 (Augusta Hwy) over Sweetwater Creek. The Project begins and ends approximately 500 feet before and after the existing bridge and will have a total project length of 0.23 miles. The project is in GMD 134. The proposed bridge will be constructed along the existing alignment and traffic will be maintained during construction with an off-site detour for a duration of approximately 9 months. The replacement bridge will be a 95-foot long single span bridge. The proposed typical section of the roadway approaches would consist of two 12-foot travel lanes with 10-foot shoulders (4-foot paved). Drawings or maps or plats of the proposed project, as approved, are on file and are available for public inspection at the Georgia Department of Transportation: Billy Baxter District 2, Area 4 Assistant Manager wbaxter@dot.ga.gov 4260 Belair Frontage Road Augusta, GA 30909 Phone: (706) 855-3469 Any interested party may obtain a copy of the drawings or maps or plats or portions thereof by paying a nominal fee and requesting in writing to: Kimberly Nesbitt Office of Program Delivery Attn: Jeff Henry Email: jhenry@dot.ga.gov 600 West Peachtree St N.W., 25th Floor Atlanta, GA 30308 Phone: (404) 663-8649 Any written request or communication in reference to this project or notice SHOULD include the Project and P. I. Number as noted at the top of this notice. 2/13, 2/20, 2/27, 3/05

Categories